PROJECT DETAIL
Central High School, an 82-year-old institution in downtown Trenton was razed and replaced by a $155 M school project in the oversight of the New Jersey Schools Development Authority. Stages, teamed with DI Group Architecture and Terminal Construction, worked on this design/build project which included a 1,000-seat auditorium, a 100-seat black box theatre, a television studio and a dance rehearsal room. This project opened in September 2019.
Location: Trenton, NJ
Architect: DI Group Architecture
Completion Date: 2019
theatre planning
theatre equipment
and lighting design