PROJECT DETAIL
As part of the Single Sustainable Campus Project, Grant MacEwan University relocated their Arts and Communications facilities to its City Centre Campus in downtown Edmonton, Alberta. Allard Hall serves as a performing arts center for the entire city. It includes a state of the art, 450-seat proscenium theatre, a 250-seat recital hall designed to serve the jazz program, a black box theatre, a full complement of rehearsal spaces, theatre production shops and labs, and two recording studios. Stages provided theatre planning, acoustics and audio-visual design. This project opened in September 2017.
Location: Edmonton, AB, Canada
Architect: Revery Architects
theatre planning
theatre equipment
and lighting design
acoustics design
performance audio
and video systems
“Allard Hall, their new home, is simply spectacular — the open, airy spaces are designed to inspire the creative talents of our students.”
- Deborah Saucier
President, Grant MacEwan University
Edmonton Journal, September 2017