Watkins Memorial High School
Project Details
Location: Etna, OH
Our Work: Stages' scope included theatre planning, acoustics, audio-visual and theatre equipment design.
Architect: Garmann Miller & Associates
Services: Acoustics, AV, Programming and Feasibility, Theatre Planning, Theatre Technology
Completed: 2021
Team Member(s): Damian Doria, FASA, Alec Stoll, ASTC, Adam T Huggard, Bob Jenista, and Micah Rahn
Southwest Licking schools were over 130% capacity when a bond measure was passed to build a new high school which will include an 800-seat auditorium. The theatre has a full fly tower with manual counterweight rigging, an all-LED stage lighting system, and a state-of-the-art sound and projection system. Stages’ scope included theatre planning and design, acoustical consulting, and AV systems design. Watkins Memorial High School opened for the 2021-2022 school year.