Trenton Central High School
Project Details
Location: Trenton, NJ
Our Work: Stages' scope included theatre planning design.
Architect: DI Group Architecture
Services: Programming and Feasibility, Theatre Planning, Theatre Technology
Completed: 2019
Team Member(s): Alec Stoll, ASTC and Micah Rahn
Central High School, an 82-year-old institution in downtown Trenton was razed and replaced by a $155 M school project in the oversight of the New Jersey Schools Development Authority. Stages, teamed with DI Group Architecture and Terminal Construction, worked on this design/build project which included a 1,000-seat auditorium, a 100-seat black box theatre, a television studio and a dance rehearsal room. This project opened in September 2019.