Appoquiniminick Fairview Campus Middle and High School

Project Details

Location: Middletown, DE

Our Work: Stages provided theatre planning and audio-visual systems design.

Architect: ABHA/BSA+A – A Joint Venture

Services: ,

Completed: 2020

Team Member(s): Alec Stoll, ASTC and Micah Rahn

Appoquinimink School District underwent the largest school expansion ever seen in Delaware. This middle and high school expansion included a performing arts center that served the district’s growing population. Stages’ scope included the theatre planning and audio-visual systems design for the performance spaces, which included an 800-seat auditorium with a balcony and fly tower, a black box theatre as well as a gymnasium space. These spaces serve to accommodate Fairview Campus’ growing performing arts and music programs. The high school is completed, and the middle school opened for the 2022-2023 school year.